Stratford General Hospital

Project Size

  • Stage 1 (2021): full-floor envelope work across Levels 5, 6, and 7 of the West Building
  • Stage 2 (2026): façade and window restoration across the W-400, W-300, and W-200 elevations, Levels 3–5

Location

Stratford, Ontario

Partners

Walterfedy

Features

  • Two-stage exterior envelope restoration of the West Building, completed in 2021 and 2026, for the Huron Perth Healthcare Alliance
  • Stage one (2020–2021): window replacement, brick repair and re-pointing, and new metal cladding across levels 5, 6, and 7
  • Stage two (2025–2026): façade restoration and window replacement across the W-400, W-300, and W-200 elevations, levels 3 to 5
  • New steel sub-girt system, semi-rigid mineral wool insulation, and air and vapour barrier (AVB) system
  • Two-tone rainscreen cladding system with insulated metal and ACM panels
  • New aluminum window systems and roof-mounted mechanical enclosures
  • Localized masonry repairs, lintel replacement, and mortar/grout work
  • Infection prevention and control measures throughout, with the hospital remaining fully operational
  • Elevation-by-elevation phased sequencing to keep entrances, deliveries, and hospital services uninterrupted