Thunder Bay Youth Transitional Housing

Under Construction

Project Size

131,650 sq ft

Location

Thunder Bay, Ontario

Partners

Form Studio Architects

Features

  • 58-unit transitional housing complex designed for the cultural and community needs of Canadian Aboriginal communities
  • Two-storey building on a slab-on-grade foundation, built with pre-engineered wood panels, EIFS, and metal siding
  • Hollow-core precast interior floor assemblies with mass timber and glulam column elements throughout
  • Indigenous medicinal and ceremonial botanicals, swales, and a dedicated teaching garden
  • Communal amenities including a basketball court, multiple bike racks, a covered structure, and outdoor seating
  • Water elements and a dry riverbed feature of cobble mulch and beach stone
  • Extensive landscaping — sodding, softscaping, hardscaping, and preserved existing greenery
  • Fenced perimeter with parking, access aisles, and a dedicated exterior staff area
  • Exterior concrete and asphalt paving with full utility and hydro civil works